top of page
Dallas Coutyard Marriot
This project was a rehab project which called for the front drive and Porte Coche to be demolished, and the concrete relaced to meet ADA standards. Diversified also installed a trench drain to help with the water flow. The project was a 1-week turnaround to minimize the down time and keep business operational!
bottom of page